Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Bediawan, D (2003) Determinants of process innovation on construction projects from contractors' perspective, Unpublished PhD Thesis, , Queensland University of Technology.

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited, Unpublished PhD Thesis, , Queensland University of Technology.

  • Type: Thesis
  • Keywords: accuracy; bias; measurement; homes; schools; design decision; forecasting; Hong Kong
  • ISBN/ISSN:
  • URL: https://eprints.qut.edu.au/16046/
  • Abstract:
    Although design decisions that are made in the preliminary design stages of a building are more cost sensitive than those that are made at later stages, previous research suggests that they result in only a slight improvement in the accuracy of building price forecasts as the design develops. However, established conventional forecasting methods lack measures of their own performance, which has inhibited the development of simpler early-stage techniques. One early-stage price forecasting model, the Storey Enclosure Method, which was developed by James in 1954, uses the basic physical measurements of buildings to estimate building prices. Although James' Storey Enclosure Model (JSEM) is not widely used in practice, it has been proved empirically, if rather crudely, to be a better model than other commonly used models. This research aims firstly to advance JSEM by using regression techniques and secondly to develop an objective approach for the assessment of model performance. To accomplish the first research aim, this research uses data from 148 completed Hong Kong projects for four types of building: offices, private housing, nursing homes, and primary and secondary schools. Sophisticated features of the modelling exercise include the use of leave-one-out cross validation to simulate the way in which forecasts are produced in practice and a dual stepwise selection strategy that enhances the chance of identifying the best model. Two types ofregressed models from different candidate sets, the Regressed Model for James' Storey Enclosure Method (RJSEM) and Regressed Model for Advanced Storey Enclosure Method (RASEM), are developed accordingly. In considering the RJSEM, RASEM, and the most commonly used alternative early stage floor area and cube models, all of the models except JSEM are found to be unbiased. The RJSEM and RASEM models are also examined for their consistency using a structured approach that involves the use of both parametric and non-parametric inference tests. This shows that although the RASEMs for different building types are generally more consistent, they are not significantly better than the other models. Finally, the combination of the forecasts that are generated from different models to capture the different aspects of information from the models is suggested as an alternative strategy for improving forecasting performance.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects, Unpublished PhD Thesis, , Queensland University of Technology.

Fox, P W (2003) Construction industry development: Analysis and synthesis of contributing factors, Unpublished PhD Thesis, , Queensland University of Technology.

Fraser, C (1998) Personal factors influencing managerial effectiveness: A study of Australian construction site managers, Unpublished PhD Thesis, , Queensland University of Technology.

Kwok, T L (1998) Strategic alliances in construction: A study of contracting relationships and competitive advantage in public sector building works, Unpublished PhD Thesis, , Queensland University of Technology.

Liston, J (1994) Contractor prequalification, Unpublished PhD Thesis, , Queensland University of Technology.

Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation, Unpublished PhD Thesis, , Queensland University of Technology.

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation, Unpublished PhD Thesis, , Queensland University of Technology.

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.

Runeson, G r (1996) Models of construction price determination: A comparative appraisal, Unpublished PhD Thesis, , Queensland University of Technology.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.

Yang, J (1991) An expert system for project analysis and control, Unpublished PhD Thesis, , Queensland University of Technology.

Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective, Unpublished PhD Thesis, , Queensland University of Technology.